Media monitoring

Adding clippings

Add coverage by URL, file, browser extension or CSV/Excel import, and move clippings between projects

View as Markdown

aclipp Monitoring brings in new coverage on its own. Everything else you add on the Clippings tab of the project. Every clipping you add goes through the same AI processing, and you can check and change the pre-filled details before saving.

Ways to add clippings#

MethodUse it forDetails
URLsOnline coveragePaste up to 250 URLs at once.
FilesPrint articles, screenshots, any other coverageUpload images or PDFs, several at once. AI reads the content and pre-fills the details.
From scratchTV segments, radio mentions, anything without a URL or fileYou enter the details yourself.
Browser extensionCoverage you find while browsingSee Browser extension.
CSV & Excel importMany clippings at onceUpload a CSV or Excel file (.xlsx), or paste CSV data.

For a CSV or Excel import, AI maps your columns to the right fields. Double-click any cell to fix a value before importing. aclipp lists every new outlet and tag the import will create.

Browser extension#

The extension saves the page you are looking at as a clipping, with a screenshot and the URL.

Install it from the Chrome Web Store. Firefox, Edge and Safari versions are coming.

  1. Open the article, blog post or social media page you want to save.
  2. Click the aclipp extension icon in the toolbar. The extension captures a screenshot (full page or cropped) and the URL.
  3. Check the extracted title, date, author and outlet. aclipp matches the outlet to the existing outlets in your account.
  4. Choose the project and organization, then click Save.

If you belong to several organizations, for example because you handle PR for several clients, pick the organization from the dropdown in the extension before saving.

Move clippings between projects#

You can move a clipping to another project in the same organization. Only projects with PR Analytics enabled appear in the list.

  • One clipping: open its ••• menu in the Clippings table or the clipping details and select Move to project.
  • Several clippings: select them in the Clippings table and choose Move to project in the batch actions bar.

Choose the destination and confirm. A clipping has to finish processing before you can move it.

What happens to the clipping's data:

  • Files, content, outlet and other standard details stay with it.
  • Tags and custom metric values carry over when the destination has a compatible equivalent. Values without a match, including project-specific formula values, are removed.
  • Relevancy is reset for the destination project.

Check currency values

aclipp does not convert currency values when moving a clipping. If the two projects use different currencies, check those values after the move.